EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
N524JL/N87JL
-
Listing of Entries
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (206)
Research
- (2)
-
Practice Kit(ordered)
-
Years of.......
Workshop
- (7)
-
Back on track
-
BIG DAY!!!!!!
-
Hangar issues and a...
-
Workshop ready
-
Two more small tables
-
Purchased and built...
-
MDF Tops/Saw
Empennage
- (51)
-
Rolled LE and FINISH
-
Attached trim tab
-
Trim tab assembly...
-
Closing up the left...
-
Left elevator riblet...
-
Right elevator complete
-
*****Right elevator...
-
Right elevator...
-
Bending the elevators
-
Elevator trim...
-
Elevator stiffeners
-
Rolling the rudder...
-
Trailing edge time
-
Rudder skins on
-
Rivet the rudder...
-
New TE wedge in
-
The TE...
-
Rudder counterweight
-
Getting ready for...
-
Rudder...
-
Beveled...
-
Rudder cont
-
Began the rudder...
-
Rudder stiffeners...
-
Beginning rudder
-
Vertical stabilizer...
-
Vert ribs
-
Vert spar
-
VERT CONT
-
Starting the...
-
Finished the...
-
Front spar and left...
-
No going...
-
Dirty hands…
-
New tool
-
Hole enlarged/response
-
Drill...
-
VA146 bearing
-
HS00005&HS00006
-
First look at a...
-
Flange tool
-
HS 714-710 bend&...
-
702 Cont
-
......702 notch...
-
Ok, so here it...
-
Transition to the...
-
Rear spar
-
Inventory time
-
It arrived!!
-
Official owner
-
EMPENNAGE ORDERED
Wings
- (57)
-
Push pull tubes...
-
Push pull tubes
-
Flap hinge work and...
-
Ailerons and flaps...
-
Weld aileron rods
-
Flaps started
-
Ailerons complete
-
Drilled/dimpled...
-
Riveting the ailerons
-
Begin ailerons
-
Roll Servo mount
-
Aileron brackets...
-
Pitot mast&tube...
-
Placed right wing in...
-
Left wing complete(ish)
-
Right wing begins
-
Left aileron&...
-
Right tank finished...
-
Left tank leak...
-
Left tank complete
-
Fuel tanks start of...
-
Countersink...
-
Left leading edge...
-
Upgraded rudder...
-
Repeat for the right...
-
Fuel flange and drain
-
Tank access panel
-
Tank attach brackets
-
Tank/ baffle...
-
Stiffeners&Z...
-
Tank...
-
Fuel tank mock up/fit
-
Leading edge cradle...
-
Wing jig built /...
-
Conduit supports...
-
Main ribs riveted
-
Wing wire conduit fab
-
Ribs complete
-
Uggghhhhhhhh
-
THE RIBS
-
Aileron spars complete
-
Spar doublers...
-
Aileron spar...
-
Finish tie down and...
-
Tie down bracket cont'd
-
Tie down fabrication
-
K1000-4 platenuts...
-
Countersink/prime/ac...
-
Tank attach nut plates
-
Inventory…...
-
WINGS ARE HERE!
-
Countersinking tips...
-
Wing tip continued work
-
Started making...
-
Zip Tips arrived!!
-
Email from Damien at...
-
Wings ordered
Fuselage
- (64)
-
HS fairing tap
-
Had to set the pedal...
-
Drilled roll bar to...
-
In case you didn't...
-
Aileron trim bracket
-
Vertical Stab attach
-
Elevator pushrod
-
HS drill and install.
-
Static port install
-
Back at...
-
Brake lines
-
Sub panel
-
Foreword deck mock-up
-
Gear weldments
-
Completed flap...
-
Flaps
-
Began covers in the...
-
Seats completed
-
Baggage bulkhead...
-
Braided teflon brake...
-
Tunnel cover pieces
-
Seat hinges
-
Side steps
-
Gussets and top skins
-
Seatbelt anchors
-
695 gussets complete
-
Began positioning...
-
F-757 Gusset and...
-
Riveted aft deck
-
Aft deck
-
FLIPPED THE CANOE
-
Finished fuselage...
-
3M Firewall sealant...
-
Began riveting side...
-
Beginning to rivet fuse
-
Completed fuselage...
-
Completed fabrication
-
Rudder pedals...
-
Upgraded rudder pedals
-
Tank attach bracket...
-
F684 gusset and...
-
Finish kit inventory...
-
Auxiliary and lower...
-
Build selfie ;)
-
Gear weldmant...
-
Straps
-
Fuselage work continued
-
Began fitting firewall
-
Finish kit arrived!
-
Bending conical bend...
-
Center section and aft
-
*PHONE AND BUILD...
-
706 bulkhead...
-
706 bulkhead
-
Rudder block
-
705 bulkhead rivet...
-
705 bulkhead
-
705 Bulkhead begin
-
Completed center...
-
Firewall complete
-
Began spar center...
-
Fuselage started!...
-
Annnddd the arduous...
-
Fuselage kit has...
Canopy
- (1)
-
Began canopy-roll bar
Controls
Firewall Forewar
Engine/Cowling
- (2)
-
James...
-
Engine ordered
Fuel System
Propeller
- (1)
-
Propeller ordered
Instrument Panel
- (6)
Avionics
- (5)
-
Installed GSA28...
-
Avionics...
-
Rest of my avionics...
-
Wire purchase
-
Bulk of avionics...
Lighting
Landing Gear
Interior Finish
Paint / Decals
Inspection
Tools
- (7)
-
Rivet the left...
-
Avionic tools in...
-
Longeron yoke
-
Die and bit holder
-
More tools purchased
-
Bought a 29 gallon...
-
Cleveland Tools...
Practice
- (2)
-
Practice kits finished
-
Practice kit arrived
Service B’s
- (1)
-
Did SB00036
Builder Name:
Jeremy Leonard
-
Project:
Vans - RV-7A
-
VIEW REPORTS
Total Hours:
1074
Total Flight Time:
Start/Last Date:
Mar 17, 2021 - No Finish Date
Engine:
Lycoming IO360M1B
Propeller:
Sensenich 3 Blade Composite Ground Adjustable/Fixed pitch
Panel:
Garmin G3XTOUCH/GNX375/G5/GTR200/GFC507
Friendly URL:
https://eaabuilderslog.org?s=N524JL/N87JL
Home or Last Project Picture
Dec 05, 2023
Finished fuselage riveting
- (6 hours)
Category: Fuselage
My buddy Nick was able to make it out today, thankfully neither one of us were held at work. We finished riveting basically from the 704 foreword and the bottom skin. We flipped the “canoe” but that's going to get it own headline.
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.